If you searched for "the ADU handbook," you want the official file, a short reading of what it tells a homeowner, and a clear line between the guide and the statute. This page is that reading. It is general information from the March 2026 handbook PDF and the code sections it cites, checked November 19, 2026. It is not legal advice for your lot. Your city, and a licensed designer you hire, still read the plans. Words that show up over and over are in the glossary.
Which file to download
HCD's Accessory Dwelling Units page says "ADU Handbook Updated March 2026." The handbook page says the same thing and links the English PDF, Accessory Dwelling Unit Handbook (PDF). The file we opened is 55 pages. The cover reads "March 2026." A footnote on the first text page says the update references the law as amended by legislation that went into effect on January 1, 2026. The PDF's own info says it was created April 16, 2026 and last modified April 22, 2026. HCD's page also says that in December 2025 it added an addendum summarizing the January 1, 2026 changes. That summary is inside this March 2026 PDF. We did not find a later edition on the page.
The handbook page also links Spanish, Vietnamese, and Chinese PDFs. One Chinese file name still says 2025. If you need the March 2026 wording, use the English PDF and check the statute when a sentence will decide your plans.
What is inside the handbook
The table of contents is short, then the FAQ gets long. Here is the map, in the handbook's own order, and what a homeowner uses each part for.
- ADUs in California, and the HCD section. Why the state keeps rewriting the rules, and how to ask HCD a question. Questions about State ADU Law go through the online ADU portal. The handbook does not print a general ADU email address.
- Glossary. The definitions the rest of the book uses, each tied to a code section. "Livable space," "permitting agency," and "66323 units" are the ones that change a plan.
- Summary of Recent Changes to ADU Law. The handbook's own list of bills from 2022 through the laws in effect on January 1, 2026. That section is covered below. It is not a substitute for the 2026 law update.
- Frequently asked questions. This is most of the book. The topics, in order, are 66323 units, what an ADU is, bedrooms, building-code violations, certificates of occupancy, the Coastal Commission, deed restrictions, fees, fire sprinklers, funding, height, homeowners associations, housing elements, junior ADUs, local ordinances, manufactured homes, mobilehome parks, multifamily ADUs, nonconforming zoning, owner-occupancy, parking, permit applications, rental terms, sales, the 2021 lot-split law, setbacks, size, solar, tiny homes, types of ADUs, unpermitted units, utilities, and zoning standards.
- Resources. A second pass at named bills, including AB 1154, the 2025 SB 9 on ordinance submittal, and SB 543, plus a summary table of statutory changes. The 2021 lot-split bill is a different SB 9. That comparison is the ADU versus lot-split page.
The rules the handbook explains
Each line below is the statute the handbook is describing, checked on the Legislature's site. Where we already have a full page, this one stays short and links there. This page is the handbook explainer. It is not a second copy of the setback guide or the fee guide.
Two approval tracks, and the size limits
The handbook spends its first FAQ on "66323 units." Those are the ADUs and junior ADUs a city must approve ministerially, even with no ADU ordinance, and only under the standards that section lists. On a lot with a proposed or existing single-family home, current section 66323 is one ADU converted from existing space, one junior ADU, and one new detached ADU. The city may cap that detached unit at 800 square feet of livable space. On a lot with an existing multifamily building, the city must allow at least one ADU, and up to 25 percent of the existing units, inside space that is not already livable, plus up to eight detached ADUs, not more than the number of existing units. A proposed multifamily building gets up to two detached ADUs. The handbook matches that count. It will be stale on the single-family detached count when AB 956 takes effect. That bill is in the section below.
Section 66314 is the ordinance track. A city may write objective standards for parking, height, setback, landscaping, architectural review, and maximum size. It may not require a minimum lot size. If there is an existing primary dwelling, an attached ADU's total floor area shall not exceed 50 percent of that dwelling. A detached ADU's total floor area shall not exceed 1,200 square feet. Those are subdivisions (d)(4) and (d)(5), in that order. Section 66321(b)(2) says a city cannot set a maximum below 850 square feet of interior livable space, or 1,000 square feet of interior livable space if the ADU has more than one bedroom. The legal guide is the checklist. The planning guide is where you choose a type and a size before you draw.
Setbacks, height, and parking
For a new ADU that is not a conversion or a same-footprint rebuild, the city cannot require more than 4 feet from the side or rear lot lines. Section 66314(d)(7). Height floors are in section 66321(b)(4): at least 16 feet for a detached ADU, 18 feet in the transit and multistory-multifamily cases, with 2 more feet so a detached roof can match the main roof near transit, and 25 feet or the main house's zoning height, whichever is lower, for an attached ADU. Parking cannot exceed one space per ADU or per bedroom, whichever is less. Section 66314(d)(10)(A). Section 66322 lists situations where the city cannot require a space at all, including a unit within a half-mile walk of public transit. The handbook also says a city may not impose parking on a 66323 unit, because that section does not authorize a parking standard. Converting or demolishing a garage does not make you replace that parking. Section 66314(d)(11). The measurements, the exemptions, and a lot sketch are in the setback, height, and parking guide.
Owner-occupancy
Section 66315 says a city shall not add standards beyond section 66314, including an owner-occupant requirement. A city may require that a rental be for 30 days or longer. A junior ADU is the exception the handbook flags. If it shares sanitation facilities with the house, section 66333(b) requires the owner to live in the rest of the house or in the junior unit. Owner-occupancy is not required when the junior unit has its own sanitation facilities, or when the owner is a government agency, a land trust, or a housing organization.
The permit clocks
The handbook's permit chapter tracks section 66317. The permitting agency has 15 business days to say in writing whether an application to create or serve an ADU is complete, and to list what is missing if it is not. It then has 60 days from a complete application to approve or deny, when a single-family or multifamily dwelling is already on the lot. A denial has to come back in writing with what is defective and how to fix it. The SB 543 timeline page is the full clock, including what happens if the city is late. Do not use this page as a second timeline.
Impact fees, and the section number to cite
Cite section 66311.5, not section 66324. SB 543, Chapter 520, Statutes of 2025, amended and renumbered section 66324 as section 66311.5. The code display says that renumbering was effective January 1, 2026. The March 2026 handbook uses 66311.5. An older handout may still say 66324. One leftover on the code site: section 66341(e), in the nonprofit sale rule, still says "Notwithstanding Section 66324." The fee rules themselves are in 66311.5.
As the statute reads today, a local agency, special district, or water corporation shall not charge an impact fee on an ADU of 750 square feet of interior livable space or less, or on a junior ADU of 500 square feet of interior livable space or less. A larger ADU is charged in proportion to the square footage of the primary dwelling. An ADU or junior ADU under 500 square feet of interior livable space does not increase assessable space for the school-fee cross-reference in that same subdivision. "Impact fee" here is not your building-permit fee, and it is not a property tax. The cost guide has the fee lines. The property-tax guide is the other bill.
Junior ADUs
Section 66313(d) defines a junior ADU as a unit of no more than 500 square feet of interior livable space, contained entirely within a single-family residence. It may have its own bathroom or share one. Section 66333 says it is built within the walls of that residence, and an attached garage counts. A city ordinance cannot require additional parking as a condition of the permit. Section 66334(a). The handbook's junior ADU chapter is the long version of those rules. Ours is the junior ADU guide.
Coastal zone, HOAs, and selling the unit
State ADU law applies in the coastal zone, and it does not lessen the Coastal Act. Section 66329 puts a 60-day decision on a coastal development permit for an ADU. The handbook tells coastal cities to update their local coastal programs so the two sets of rules can be applied together. Who decides, and what an appeal can still do, is the coastal zone guide.
The handbook's emergency certificate rule is section 66328. The usual rule is that the ADU does not get a certificate of occupancy before the main house does. The exception is a county under a Governor's state-of-emergency proclamation dated on or after February 1, 2025, when the main house was substantially damaged or destroyed by that event, and the ADU has construction permits and has passed its inspections. The exception does not apply to an ADU attached to the main house. The coastal guide has the same limits.
Civil Code section 714.3 makes void a covenant that effectively prohibits or unreasonably restricts an ADU or junior ADU on a lot zoned for single-family residential use. Reasonable restrictions are allowed. They shall not include fees or other financial requirements. The handbook tells you to take a ban in the CC&Rs to your city, and it says an HOA does not get a vote in the city's ministerial approval. Section 66315.
The default in section 66314(d)(1) is that the ADU is not sold off by itself. Section 66341 requires a separate sale to a qualified buyer when a qualified nonprofit built the ADU or the main house and the recorded restrictions in that section are met. Section 66342 is the other path: a city may adopt an ordinance to convey the house and the ADU as condominiums. The handbook describes both. Ask the city whether it has adopted that ordinance before you plan a sale. This page does not restate the nonprofit contract terms.
The grant chapter is a closed program
The handbook's funding answer says that, at the time of that writing, the CalHFA ADU Grant Program's funds had been exhausted. It describes the grant as up to $40,000 for predevelopment costs, not for the construction itself. CalHFA's ADU page says the latest round was fully allocated on December 28, 2023, and it warns that offers to "get you the grant" are a scam. The grant is not open. Status and what to do instead are on our CalHFA grant page. The handbook also names loan programs and some funding for local agencies. This page does not describe those as money you can apply for.
What changed in this edition
The handbook's "Summary of Recent Changes to ADU Law" is a running history. It starts with 2022 bills that took effect January 1, 2023, then 2023 bills, then 2024 bills, including the renumber into sections 66310 to 66342. The newest block is 2025 legislation. The handbook says those changes took effect June 30, 2025, October 10, 2025, and January 1, 2026. It names AB 1154 (Chapter 507, Statutes of 2025), SB 9 (Chapter 510, Statutes of 2025), SB 543 (Chapter 520, Statutes of 2025), AB 462 (Chapter 491, Statutes of 2025), and AB 130 (Chapter 22, Statutes of 2025). The 2025 SB 9 in that list is the ordinance-submittal bill. It is not the 2021 lot-split law.
In the handbook's own words, turned into short sentences, that newest block does this:
- It moves section 66324 to 66311.5, section 66327 to 66313.5, and section 66332 to 66311.7, and it notes a new section 66333.5 for junior ADU ordinances.
- A junior ADU with shared sanitation facilities requires owner-occupancy. One with its own sanitation facilities does not. A rented junior ADU must be for longer than 30 days.
- If a city fails to send an adopted ADU ordinance to HCD within 60 days, or fails to answer HCD's findings within 30 days, that ordinance is null and void and the city applies state law. The same timing applies to a junior ADU ordinance. Section 66326(d).
- A permitting agency must decide completeness within 15 business days and, on an incomplete notice, list what is missing. An appeal of that notice or of a denial gets a final written determination within 60 business days.
- A coastal development permit for an ADU is approved or denied within 60 days, as section 66329 spells out.
- Size limits are measured as interior livable space.
- No impact fee on an ADU of 750 square feet of interior livable space or less, or a junior ADU of 500 square feet of interior livable space or less. A larger ADU is charged in proportion to the primary dwelling. A unit under 500 square feet of interior livable space does not increase assessable space. Section 66311.5.
- HCD's guideline authority covers junior ADUs as well as ADUs. Section 66313.5.
- Fire sprinklers are not required for a junior ADU when the main home is not required to have them, and adding the unit does not trigger sprinklers in the existing home.
- It states the combination of units allowed under section 66323.
- It states the emergency certificate-of-occupancy rule in section 66328, described above, including the damage test. Read subdivision (c) in the statute: the exception does not cover an ADU attached to the main house.
- Reasonable restrictions in covenants shall not include fees or other financial requirements. Civil Code section 714.3(b).
- It removes the old rule that let a city impose objective standards on certain multifamily units if the city had adopted an ADU ordinance by July 1, 2018.
That is the handbook's list. The earlier years are still printed in the same section of the PDF if you want the 2022, 2023, and 2024 history. Bills chaptered after this edition are not in it.
What the handbook does not cover yet
Two bills were chaptered on September 29, 2026, after the March 2026 PDF. Both are marked non-urgency on the Legislature's status pages. Under California Constitution Article IV, section 8(c)(1), a statute enacted at a regular session goes into effect on January 1 next following a 90-day period from enactment, unless it is an urgency statute. Ninety days from the September 29, 2026 enactment date ends in late December, so the January 1 that follows is January 1, 2027. These two are not in the handbook.
SB 1117 (Cervantes), Chapter 809, Statutes of 2026, amends only section 66311.5. It keeps the ban on an impact fee for an ADU of 750 square feet of interior livable space or less, and for a junior ADU of 500 square feet of interior livable space or less. For up to two ADUs on a lot, an impact fee on a larger ADU is charged in proportion to the primary dwelling, and only on the square feet above 750. On a lot with more than two ADUs, the fee on a larger ADU stays proportional to the whole unit, which is today's rule. The bill says the change applies to charter cities. It does not set a dollar amount. Our CalHFA page already walks through that fee change. It is a fee rule, not a reopening of the grant.
AB 956, Chapter 791, Statutes of 2026, amends section 66323 and Civil Code sections 714.3 and 4751. On a single-family lot, the ministerial detached count goes from one new ADU to two. Each still has the 4-foot side and rear setback, the 800-square-foot livable-space cap, and the detached height floors. A city is not required to ministerially approve a junior ADU on a lot where those two detached units have been built. The covenant ban, which today covers a lot zoned for single-family use, will cover a lot zoned to allow single-family use. Multifamily counts in the amended section stay as they are now. The 2026 law update is the page for these two bills. This page only flags that the handbook's 66323 chapter still describes one detached single-family unit, which matches the code in force on November 19, 2026.
We checked these two bills because they amend the sections the handbook explains. This is not a claim that no other 2026 bill exists. If a city cites a chaptered bill that is not listed here, read that bill on leginfo before you rely on the handbook.
How to use it with your city
- Download the March 2026 English PDF from HCD's handbook page, and open the code section next to any sentence that will change your site plan. The diagram above is the habit.
- Read your city's ADU ordinance beside it. If the city has no ordinance, the handbook says the application is subject only to state standards. If it has one, the city may be less restrictive than the statute. Section 66325 is the handbook's cite for that. A stricter rule loses where the statute sets a ceiling, such as the 4-foot setback.
- Ask for the local section in writing when a counter handout and the statute disagree. Objective standards are allowed on the ordinance track. A comment that the design does not "fit the neighborhood" is the kind of subjective standard the handbook says a city cannot use. The definition is in section 66313(i).
- Check whether the ordinance was sent to HCD. Section 66326(d) says an ordinance the city does not submit within 60 days of adoption, or does not answer within 30 days of HCD's findings, is null and void. The city then applies the state standards until it adopts a compliant ordinance. HCD posts ordinance review letters from its ordinance page.
- If a rule still conflicts, use HCD's portal. The ADU page links an Accessory Dwelling Unit Portal to "submit technical assistance requests and potential violations for review." The handbook says to send questions there, to work with the city through its own appeal first, and that HCD may not follow up with the city if you do not have a pending application. The same ADU page links a technical assistance and enforcement letters dashboard you can search by city.
The legal guide is the short checklist. The handbook is the state's longer explanation of the same rules.
Open the Legal Guide
Questions homeowners ask
Is the California ADU Handbook the law?
No. It is HCD's guide to state accessory dwelling unit and junior ADU law. The law is Government Code sections 66310 to 66342. If the handbook and the statute disagree, follow the statute, then your city's ordinance where the statute lets the city choose.
Which edition is current, and where is the PDF?
On November 19, 2026, HCD's ADU page says the handbook was updated March 2026. The handbook page links one English PDF, and that file is titled March 2026. The same page also links Spanish, Vietnamese, and Chinese versions. One Chinese file name still says 2025, so use the English PDF when you need the March 2026 text.
Does the handbook require my city to approve my ADU?
No. The statutes do. The handbook explains them. A city with no ADU ordinance applies the state standards. A city with an ordinance may be less strict. It cannot be stricter where the statute sets a maximum.
Do I have to live on the property if I add an ADU?
Not for an ADU. Section 66315 bars a city from adding an owner-occupant requirement. A junior ADU that shares a bathroom is different. Section 66333 requires the owner to live in the house or in the junior unit, unless the owner is a government agency, a land trust, or a housing organization. A junior ADU with its own bathroom does not have that owner-occupancy rule.
Does the March 2026 handbook include the January 2027 changes?
No. SB 1117 and AB 956 were chaptered on September 29, 2026. Both are non-urgency bills, so they take effect January 1, 2027. The handbook's newest summary stops at laws in effect by January 1, 2026.
What if my city's rule conflicts with the handbook?
Ask the city to point to the code section it is using. If you still have a conflict on a pending application, HCD's ADU page links a portal for technical assistance requests and potential violations. The handbook says to use that portal, and to work with the city first.
Sources
Sources checked November 19, 2026. Last reviewed: November 19, 2026.
- HCD, Accessory Dwelling Units. "ADU Handbook Updated March 2026." The page links the Accessory Dwelling Unit Portal for technical assistance requests and potential violations, the ordinance-review letters, and the enforcement-letters dashboard.
- HCD, ADU Handbook page. Labels the current handbook "Updated March 2026," notes the December 2025 addendum on laws in effect January 1, 2026, and links the English PDF plus Spanish, Vietnamese, and Chinese files.
- HCD, Accessory Dwelling Unit Handbook, March 2026 (PDF). Table of contents, the Summary of Recent Changes, the FAQ topics used above, the portal instruction, the CalHFA funding answer, and the footnote that the update references law in effect January 1, 2026. File info: created April 16, 2026, modified April 22, 2026, 55 pages.
- HCD Accessory Dwelling Unit Portal. The link on the ADU page for technical assistance and potential violations.
- HCD, Submit an Ordinance / View TA and Ordinance Review Letters.
- HCD, Technical Assistance and Enforcement Letters.
- Gov. Code §66311.5. Impact fees, utility connection charges, and the school-fee cross-reference. Credit line: added by renumbering section 66324 by Stats. 2025, Ch. 520, Sec. 7 (SB 543), effective January 1, 2026.
- SB 543 (2025-2026), bill text. Section 7 amends and renumbers Government Code section 66324 as section 66311.5. Status: Chapter 520, Statutes of 2025, chaptered October 10, 2025, non-urgency. The code display states the January 1, 2026 effective date.
- Gov. Code §66313. Definitions, including junior ADU at 500 square feet of interior livable space, livable space, local agency, objective standards, and permitting agency.
- Gov. Code §66314. Ordinance standards, the 50 percent attached cap, the 1,200-square-foot detached cap, the 4-foot setback, parking, replacement parking, and sprinklers.
- Gov. Code §66315. No added owner-occupant standard. Rentals of 30 days or longer may be required.
- Gov. Code §66317. Fifteen-business-day completeness decision and the 60-day approval or denial.
- Gov. Code §66321. The 850 and 1,000 square foot floors, the 800 square foot floor that other limits cannot block, and the height floors.
- Gov. Code §66322. Parking exemptions.
- Gov. Code §66323. Current ministerial unit counts, in force on November 19, 2026, before AB 956.
- Gov. Code §66325. This article supersedes a conflicting ordinance. A city may adopt less restrictive requirements.
- Gov. Code §66326. Ordinance submittal to HCD, and when an ordinance is null and void. Amended by Stats. 2025, Ch. 510 (SB 9), effective January 1, 2026.
- Gov. Code §66328. Certificate of occupancy, including the emergency exception and the attached-unit exclusion.
- Gov. Code §66329. Coastal Act still applies, and the 60-day coastal development permit decision.
- Gov. Code §66333. Junior ADU ordinance rules, including shared-sanitation owner-occupancy.
- Gov. Code §66334. No additional parking as a condition of a junior ADU permit.
- Gov. Code §66341. Separate sale to a qualified buyer when a qualified nonprofit developed the unit and the recorded restrictions are met. Subdivision (e) still names section 66324.
- Gov. Code §66342. A city may adopt an ordinance to convey the primary dwelling and the ADU as condominiums.
- Civil Code §714.3. Covenants that prohibit or unreasonably restrict an ADU or junior ADU on a lot zoned for single-family residential use are void. Reasonable restrictions shall not include fees. Amended by Stats. 2025, Ch. 22 (AB 130), effective June 30, 2025.
- SB 1117 status and bill text. Cervantes. Chapter 809, Statutes of 2026. Chaptered September 29, 2026. Non-urgency. Amends section 66311.5 only.
- AB 956 status and bill text. Chapter 791, Statutes of 2026. Chaptered September 29, 2026. Non-urgency. Amends Civil Code sections 714.3 and 4751 and Government Code section 66323.
- California Constitution, Article IV, section 8. A non-urgency statute enacted at a regular session takes effect on January 1 next following a 90-day period from enactment.
- CalHFA, ADU Grant Program. Latest round fully allocated December 28, 2023. Up to $40,000 while funds lasted, for predevelopment and non-recurring closing costs, not construction. Warns that later offers to obtain the grant are a scam.