Anaheim ADU Guide: Permits, Costs & Rental Income (2026)

Updated October 22, 2026 Orange County City Guides
Detached backyard ADU with covered entry, representative of ADUs built by Anaheim, California homeowners
← Back to All Locations

By ADU Home Construction editorial team · Last reviewed October 22, 2026

Direct answer: Anaheim runs two tracks. Most ADUs and junior ADUs go through ordinary building review with a licensed architect, engineer, or designer. Eligible single-family lots can use ADU Express with a free pre-approved plan. Local standards are Anaheim Municipal Code section 18.38.015. Questions go to ADUAnaheim@anaheim.net.

Ordinary review versus Express

The city’s ADU Anaheim page says an ADU can be detached or attached and has to sit on a lot with a proposed or existing primary home. A junior ADU has to be built inside an existing single-family residence, and it carries a deed restriction for owner-occupancy. Both are in section 18.38.015. The page says most applications use the standard building review, and it sends building-permit questions to anaheim.net/building.

The same page says ADU Express lets a qualified single-family property finish the review in 1 to 3 days, and that Express is only for certain single-family lots using a pre-approved detached plan. Some of those plans still need a designer to finish the site plan, Title 24, structural details, or a soils report. The catalogue page for each plan says which extra documents that plan still needs.

The Express sequence, including the slower screening step

The ADU Express process is seven steps, and it does not start at the counter:

  1. Search the address in the ADU Express Eligibility Tool. If the lot is not eligible, the city sends you back to standard review.
  2. Pick a plan from the pre-approved catalogue. Read the notes column.
  3. Call Anaheim Public Utilities at (714) 765-6847 and ask for a free meter spot, specifically “a 400 amp, multi-meter location.” Staff will not meet to draw the site plan until that report exists. The city says the site visit usually happens within three business days.
  4. Email the meter-spot report and the plan number to ADUAnaheim@anaheim.net. The catalogue page says this eligibility screening can take a few weeks. That is a different clock from the 1-to-3-day review on the landing page. Both sentences are on city pages. Plan on the screening time before you count the short review.
  5. After preliminary approval, staff schedule a City Hall meeting to draw the site plan and upload the file to the online portal. You download and print the construction documents from that portal.
  6. The Building Division tells you which development-impact and school fees apply. Anaheim says it has six school districts and will tell you which office to pay. Fees are paid before the permit is issued. The Express page says that once you come back from the school-fee payment, staff should be able to issue the building permit, all within one day.
  7. Schedule inspections at Anaheim.net/Next.

Four catalogue plans, listed as free

On October 22, 2026 the catalogue listed four plans and marked each one free. The page says they include building-code requirements that took effect July 1, 2024.

“Free” on that table is the plan set, not the construction contract, the school fee, or the impact fee.

Construction price

Anaheim’s ADU pages do not publish a build-cost range. A number from our 2026 cost guide is a planning estimate for the contract only. School and impact fees are whatever the Building Division quotes for your plan, paid before issuance.

City Hall’s published address for this program is 200 S. Anaheim Blvd., Anaheim, CA 92805, (714) 765-4311. More city pages in this series are on the city guides hub. Garden Grove uses its own counter: Garden Grove ADU permits.

Sources

Reviewed October 22, 2026: