Orange County city permit desks first, then the Los Angeles County pages that are live, then Salinas on the Central Coast, plus the county desk for unincorporated Orange County.
OC Public Works describes building permits, including over-the-counter and regular plan check, for private property in unincorporated Orange County and for county-owned property. The county’s pre-approved ADU plans are for new detached units. Some site-specific design is still required. You submit a complete package through the county portal the page calls MyOCService. The package has to include the chosen plan with a finished title sheet, a site plan showing property lines, dimensions, and structures, a solar plan from a third-party installer, a plan-preparation checklist, a hold-harmless statement, a completed WQP/NPP form, and sheets 1 and 2 of the construction-and-demolition diversion work plan.
Six floor plans were posted when we reviewed the page. They still reflect the 2022 California Building Code. The county says it is updating them to the 2025 code and that the updated sets are not up yet.
The plans page lists 855-886-5400. The county says the sets are meant to lower pre-construction cost and speed approval. It does not print a construction-contract price. A figure from our 2026 cost guide is a planning estimate for that contract, whether the permit desk is a city or the county.
Each card below links a short guide. The official page, not this hub, is the permit authority.
Older posts that tried to cover all of Orange County in one template now point here. If your city is not on this list, call that city’s building counter. Do not file an Irvine, Anaheim, Santa Ana, Garden Grove, Huntington Beach, or Newport Beach permit for a lot in another city, and do not file the county’s unincorporated plans for a lot inside one of these cities.

IrvineReady is the upload path. The pre-approved plan list on the city site is marked coming soon.
Read the Irvine ADU Guide →
Ordinary building review, or ADU Express on an eligible single-family lot using a plan the city marks free.
Read the Anaheim ADU Guide →
Pre-approved plans are detached, on paper, and closed to flood zones A and AE plus four mapped districts.
Read the Santa Ana ADU Guide →
Ministerial review, one 490-square-foot plan that cannot be altered, and a coastal permit on some lots.
Read the Huntington Beach ADU Guide →
Size caps, a 30-day rental minimum, and plan-check fees the city prints as dollar ranges.
Read the Newport Beach ADU Guide →Chapter 9.54, GG Ready, and four free ADU Go plans that cannot be used in Flood Zone A.
Read the Garden Grove ADU Guide →Only the cities with a live permit page are listed. Each one uses its own counter. Long Beach and Los Angeles keep their existing blog addresses.
State ADU law applied directly. In-person USB submittal at the Permit Center. Pre-approved plans are for new construction only.
Read the Long Beach ADU Guide →LADBS review under LAMC 12.22 A.33, ePlanLA, the Standard Plan Program, and AB 2533 legalization.
Read the Los Angeles ADU Guide →Ordinance 7420, online submittal, and a free 374 square foot Prototype A plan updated to the 2025 building code.
Read the Pasadena ADU Guide →One city page is live in this section. Salinas uses its own Permit Center. A Monterey County counter is not a substitute for a lot inside the city.
Paperless portal, four pre-approved detached plans, and only the 2025 plan sets for a new application since October 1, 2026.
Read the Salinas ADU Guide →The guides above are the city counters. Send a contractor-match request, then confirm any license at cslb.ca.gov, or download the free ADU eBook.