Huntington Beach ADU Guide: Permits, Costs & Rental Income (2026)

Updated October 22, 2026 Orange County City Guides
Backyard accessory dwelling unit with patio seating, representative of ADUs built by Huntington Beach, California homeowners
← Back to All Locations

By ADU Home Construction editorial team · Last reviewed October 22, 2026

Direct answer: Huntington Beach Zoning and Subdivision Ordinance section 230.10 no longer regulates ADUs. The city says it ministerially reviews every ADU and junior ADU, coastal-zone projects may need a coastal development permit, and the only pre-approved plan it is offering is a one-story detached unit of 490 square feet that cannot be modified.

The local section the city says is dead

The planning page for Accessory Dwelling Units quotes a March 7, 2023 City Council direction that staff keep accepting ADU applications. It then says section 230.10 stopped operating when the Legislature’s ADU and junior ADU laws took effect on January 1, 2020. Development standards are not reprinted on that page. The city tells you to use its ADU handout and the state housing department’s ADU handbook. Questions on that page go to (714) 536-5511.

Because the handout is where the city put the zoning criteria, this page does not invent a Huntington Beach setback or height table.

The 490-square-foot plan

Under AB 1332, the city is offering one HB Pre-Approved ADU Plan: one story, detached, 490 square feet. The page says using it saves design time and money, and it says modifications or deviations are not allowed. The same notice is posted on the Permit Center page, which is also where you apply through the HB ACA portal: permits, plan check, status, and older records.

2025 building code, and a payment warning

The Permit Center says the 2025 California Building Standards Code took effect January 1, 2026. Plans submitted before that date stay on the 2022 code. Applications that were still incomplete after March 31, 2026 are void. Moving the project forward means a new application and plans that state the 2025 code. That cutoff is already past.

The same page warns about a phishing scam aimed at people with pending planning or permit projects. The city says official email uses an @surfcity-hb.org address only. Card payments go through huntingtonbeachca.gov/aca, not a wire to a bank account. A check or bank transfer is accepted only when you asked for that method and the instructions came through official city communication. Since July 1, 2024, credit and debit card transactions carry a 3 percent service fee. The Permit Center phone is (714) 536-5271. If a payment email looks off, call that number or your assigned technician. Do not use the phone number in the suspicious email.

What this page will not price

The ADU page and the Permit Center page do not list a construction-contract range or an ADU permit fee. The 3 percent figure above is a card-processing fee, not a building fee. A dollar range in our cost guide is a planning estimate for the build, useful only until you have bids and a city invoice. Coastal rules for this city are not the same document as Newport Beach’s. The statewide steps, including the 60-day coastal decision required since October 10, 2025, are in the coastal zone ADU permit guide.

Sources

Reviewed October 22, 2026:

Quick Huntington Beach Contractor Match
Share a few details and we will route your request with city page attribution.