The packet the project page requires
Use the city’s ADU project page (the www.cityofirvine.gov address). On October 22, 2026 it required all of the following:
- ADU Verification Form, requested from Planning
- Completed ADU permit application
- Building plans, calculations, and construction documents
- Development standards checklist for the site plan
- Hold-harmless affidavit
- A covenant from Planning, which has to be notarized and recorded with the County of Orange Recorder when the case planner tells you to
- Signed affidavit from the owner and the applicant. Digital signatures also need the city’s electronic-signature disclosure
- Developer deposit case set-up form, electronic or wet-signed
- School-fee determination form, transportation-corridor-agency form, and address application, all included in the ADU permit-application package
The page says staff check the submittal for completeness within about two business days and email you if something is missing. You then get an email link to pay the fees. Current rates are on the fee-schedule page linked from that project page. Review starts after payment. This guide does not repeat those rates, because the city keeps them on the fee schedule rather than on the ADU page.
IrvineReady, specifically
The city says IrvineReady works best in Google Chrome. Create an account, or sign in, then use the green plus button at the lower right to open a submittal. In Project Type, choose “For Permitting--Other.” The project page links short videos for creating the account and for preparing the upload. Keep the ADU page open in another tab while you do it.
Pre-approved plans are not a menu yet
The Pre-Approved ADU Plans Program says the city reviews architectural and structural plans from licensed designers for building-code compliance, then still reviews the lot for zoning and the foundation when you apply. The city describes that path as faster and as a way to reduce permit-application cost. It does not attach a dollar amount to that sentence.
The plan list on that page is the line “Coming soon.” Designs that do get listed will be owned by the design firm. You buy them from the firm, and the city says a listed plan may still be refused for some lots. A vendor who wants a plan added emails the Community Development Assistance Center at CDAC@cityofirvine.org.
The project page does not state an HOA rule, a short-term-rental rule, or a construction-price range. Those are left off this page on purpose. Unincorporated Orange County plans, described on the county hub, are not Irvine permits. A Garden Grove lot uses the Garden Grove permit guide, not this page.
A planning estimate is not an Irvine fee
Until Planning emails the fee link, the only honest placeholder for the construction contract is a planning estimate. Ours is the 2026 cost guide. It is not the Irvine fee schedule and it is not the school-fee or transportation-corridor form in the RADU package.
Sources
Reviewed October 22, 2026:
- City of Irvine, Project: Constructing an Accessory Dwelling Unit — RADU packet, IrvineReady project type, about two business days for a completeness check.
- City of Irvine, Pre-Approved ADU Plans Program — plan list marked coming soon; plans owned by the design firm.