Salinas ADU Permit Guide (2026)

November 24, 2026 City Guides
← Back to City Guides

By ADU Home Construction ยท Last reviewed: November 24, 2026

Direct answer: Can I build an ADU in Salinas, and what does the city require? Many residential properties may qualify, and the city requires a building permit before construction. You file it in the paperless portal after talking with Current Planning. The city offers four pre-approved plans for new detached ADUs, and since October 1, 2026 it accepts only the 2025 sets.

Who reviews an ADU in Salinas

The City of Salinas Accessory Dwelling Units page says ADUs are regulated by California law and by the city's building and development standards. The page does not print a municipal-code section number, so this guide does not invent one. Start on that page, then confirm the lot with Current Planning.

The same page tells you to discuss the project with the Current Planning Division before you prepare plans. The ADU Hotline on that page is 831-758-7208, and the email is aduinquiry@salinas.gov. Appointments are through QLess. The pre-approved ADU checklist prints the appointment link as kiosk.na4.qless.com, and it lists Planning at 831-758-7206, currplanwebmail@salinas.gov.

Building permits are handled at the Permit Center, 65 West Alisal Street. The counter is open Monday through Friday, 8:00 a.m. to 5:00 p.m. Payments stop at 4:00 p.m. It is closed Saturday, Sunday, city holidays, and the first Friday of each month from 8:00 a.m. to 1:00 p.m. Appointments run Monday through Friday, 9:00 a.m. to 4:00 p.m. The Permit Center phone is 831-758-7251 and the email is epermit@salinas.gov. Permit Services reports 237 approved ADU permits for the fiscal year from July 1, 2024 to June 30, 2025.

Statewide background, including terms in the glossary, is on our legal guide and the HCD ADU page. This page is only for a lot inside the City of Salinas. A lot in unincorporated Monterey County uses a different counter.

File the building permit in the paperless portal

The ADU page says all building permit applications are submitted electronically through the City of Salinas Paperless Permit Portal. The new ADU checklist points that portal to salinas-ca-us.avolvecloud.com. The checklist says to gather the packet before you start the paperless application.

The ADU page lists these submission steps:

  1. Create an account or log in to the Paperless Permit Portal.
  2. Start a new building permit application for the proposed ADU.
  3. Upload all required plans and supporting documents.
  4. Submit the application.
  5. Building Division staff identify applicable fees and send payment instructions.

If the application is incomplete, the ADU page says the city can ask for more information before review continues. After approval and issuance, you schedule inspections as the work proceeds, build to the approved plans, and get final inspection approval before anyone occupies the ADU. The same page says outstanding fees, or other requirements such as applicable deed restriction documentation, may have to be finished before the permit is issued.

The new ADU checklist says plan sheets are signed and dated PDFs, one sheet per file, landscape, at 24 by 36 inches or 30 by 42 inches, with no password. The first character of the sheet name is the discipline, such as A for architectural. The cover sheet lists the 2025 California Building or Residential Code and the electrical, mechanical, plumbing, energy, fire, and green building codes, plus the Salinas Municipal Code. It also asks for the preparer's title and registration if one applies, the project address, the assessor parcel number, and the legal owner's name. Planning questions on that checklist go to 831-758-7206. Building and the paperless line are 831-758-7251, option 1, askbuilding@salinas.gov. Fire is 831-758-7466. Engineering is 831-758-7251, option 2.

How a project gets from a lot sketch to a complete application is covered in planning basics. The city's own steps above are the ones that matter in Salinas.

Fees the city prints

The ADU page says some ADUs qualify for development impact fee exemptions, and that building permit fees and other applicable fees may still be charged. The Public Works development impact fee page says those fees apply to residential and non-residential projects that need a building permit whenever enclosed building space is added. That page prints no ADU exemption. Ask Public Works which of those fees apply to your unit.

State law is separate from that local page. Government Code section 66311.5 says a local agency, special district, or water corporation shall not impose an impact fee on an ADU of 750 square feet of interior livable space or less, or on a junior ADU of 500 square feet of interior livable space or less. A larger ADU is charged in proportion to the primary dwelling. Connection fees and capacity charges are not impact fees under that section. The statute does not set a dollar amount.

Two city sentences use "10 percent," and they are not the same thing. The new ADU checklist says: "Building permit fees vary based on project valuation and are approximately 10% of the project valuation." It also says you pay the plan check fee first, and that plan check is a percentage of the total permit fee. Planning, Fire, and Engineering fees may apply. The pre-approved ADU guidebook says the remaining building permit fee, "of about 10%," is due before the permit is issued. That share is the unpaid part of the permit fee.

The FY 2026-27 citywide fee schedule lists a Planning Inspection Fee of $336.75 per inspection for "Residential: 1-9 Units, ADU & JADU." The adopted fee is effective July 1, 2026. The planning table says the technology surcharge is not included. The schedule lists no waiver of development or traffic impact fees for ADUs. Its housing in-lieu fee and rental impact fee are written for developments under the inclusionary ordinance.

Outside the city schedule, the new ADU checklist says Monterey One Water may charge a one-time sewer fee for added sewer capacity. You contact that agency for the estimate, at 831-372-2385, and you bring a receipt or a waiver before the building permit is issued. School fees depend on the district and the square footage. The checklist says you contact the district and bring a receipt or a waiver before issuance. Neither figure is printed as a dollar amount on the city checklist.

For the construction contract, a figure in our 2026 cost guide is a planning estimate. It is separate from the Salinas fees above.

Four pre-approved plans for a new detached ADU

The ADU page offers four floor-plan models for new detached ADUs. Each model comes in Craftsman, Mid-Century, Ranch, and Spanish.

The ADU page says these plans are for new detached ADUs inside Salinas. They cannot be used for an attached ADU or for a conversion of existing space. A garage conversion follows a different packet. See the garage conversion guide for the statewide conversion questions, then use the conversion checklist on Permit Services if that is your project. Site-specific plans are still required. The ADU page says using a pre-approved plan does not guarantee approval. A change to the design may need more review and can affect the streamlined path. Effective October 1, 2026, only the 2025 pre-approved plan sets are accepted for a new building permit application. The page links a 2025 PDF for each model.

Permit Services says the 2025 California Building Standards Code has a January 1, 2026 effective date. That is the code context for the October 1, 2026 plan-set rule. Download the 2025 file the ADU page links, and confirm with the Permit Center that the file you have is the one it will accept.

Salinas pre-approved detached ADU plans Bar chart of four Salinas pre-approved detached ADU plans. Model 1A is 495 square feet with 1 bedroom and 1 bathroom. Model 1B is 553 square feet with 1 bedroom and 1 bathroom. Model 2A is 749 square feet with 2 bedrooms and 2 bathrooms. Model 2B is 746 square feet with 2 bedrooms and 1 bathroom. From October 1, 2026, only the 2025 plan sets are accepted. The plans are for new detached ADUs only. Salinas pre-approved detached ADU plans 1A, 1 bed, 1 bath 495 sq ft 1B, 1 bed, 1 bath 553 sq ft 2A, 2 bed, 2 bath 749 sq ft 2B, 2 bed, 1 bath 746 sq ft Styles: Craftsman, Mid-Century, Ranch, and Spanish. New detached ADUs only. From October 1, 2026, only the 2025 plan sets are accepted for a new application. Site-specific plans are still required. A pre-approved plan does not guarantee approval.
Source: City of Salinas, Accessory Dwelling Units, checked November 24, 2026. Square footage is the city's published floor-plan size, not a citywide maximum.

Homeowners who pick an existing city design start at Phase 2 on the ADU page. Phase 1 is the path for a designer submitting a new model for city pre-approval. Phase 2 is: choose the design, prepare the site-specific documents, submit in the paperless portal, answer review comments and pay the applicable fees, then start construction after the building permit is issued.

The pre-approved checklist says to use the city's Pre-Approved ADU Guidebook for the detail. The file still posted is the 2023 guidebook. It says a consultation with Current Planning is mandatory before a new detached pre-approved ADU, and that the planner signs a consultation form or sends you back for more information. Bring the address, photos of the house and the ADU location, the floor plan you prefer, and a measured sketch of the lot. The main ADU page, checked the same day, says to contact Current Planning before you select a pre-approved plan. The word "mandatory" is in the guidebook.

The guidebook says these documents are uploaded at application: the pre-approved plans as single sheets, with every field on sheet T.1 completed; a site plan; a hold harmless statement signed by the property owner; the grant deed, all pages; the construction and demolition waste form; and the extra items from its step 4. The checklist also names a cover sheet, an energy certificate of compliance, a photovoltaic system that can be deferred and must be done before the final inspection, truss calculations if needed, a soil report if needed, a gas line diagram, a fire sprinkler if needed as a deferred submittal, and an addressing application and exhibit.

On deed restrictions, the guidebook says Current Planning generates a deed restriction after the building permit application is submitted. The owner signs it. The guidebook says the restriction acknowledges three things: the ADU shall not be rented for less than 30 days; the ADU shall not be sold separately from the primary residence; and the approved site plan from the pre-approved plans is included. The main ADU page does not repeat those three lines. It says applicable deed restriction documentation may be required before the permit is issued. It does not print a notarization step, a recorder's timeline, or a number of weeks. Ask Current Planning what your file has to record.

Setbacks and parking the city states in one line each

The ADU page says many ADUs qualify for four-foot side and rear setbacks, subject to exceptions and to building and fire safety requirements. The published sizes on that page are the four plans above and the junior ADU limit below. It does not add a height table. Statewide size, height, and setback rules are summarized on our legal page and at HCD. Ask Current Planning which exception applies to your lot before you rely on four feet.

On parking, the ADU page says additional parking is not required for some ADUs, including those that qualify for a statutory parking exemption. It does not print a local space count. Garage conversions and replacement parking are covered in the garage conversion guide. Use the Salinas sentence for this city.

The 60-day clock, without a city turnaround

The ADU page says state law generally establishes a 60-day period to act on a complete ADU application, subject to exceptions and procedures. Government Code section 66317 says the city decides whether the application is complete within 15 business days, then approves or denies a complete application within 60 days when a single-family or multifamily dwelling is already on the lot. If the city is late, the application is deemed approved. The approval is ministerial, without a hearing. If the ADU application is filed with an application for a new house, the city may wait to decide the ADU until it decides the house. The Salinas ADU page does not publish a local number of weeks. Our SB 543 timeline explains what to write down. Ask the Permit Center which clock it is tracking on your file.

Coastal Zone

The City of Salinas does not appear on the Coastal Commission's June 2025 list of coastal jurisdictions. Monterey County does. The Salinas ADU page does not add a coastal permit step. This guide is for a lot inside the city. If a parcel map ever shows otherwise, follow the map and the county that actually has jurisdiction.

Junior ADUs

The ADU page answer is: a junior ADU is no more than 500 square feet, created within an existing or proposed primary dwelling or a qualifying attached garage. It needs an efficiency kitchen. It may have its own bathroom or share one with the primary dwelling. Owner occupancy is a state rule, not a sentence on the Salinas page. Government Code section 66333(b) requires owner occupancy only when the junior ADU shares sanitation facilities. It is not required when the junior unit has its own sanitation, or when the owner is a governmental agency, land trust, or housing organization. The same section requires a recorded deed restriction for a junior ADU. Confirm the form with the city before you record it. The longer explanation is the junior ADU guide.

Homeowner associations

The ADU page says HOA restrictions on ADUs are limited by California law. It does not add a Salinas HOA permit. Civil Code section 4751 makes void a covenant that effectively prohibits or unreasonably restricts an ADU or junior ADU on a lot zoned for single-family residential use. Reasonable restrictions can remain. Details are on our legal page.

Official Salinas links

Questions homeowners ask

Does Salinas charge impact fees on ADUs?

The ADU page says some ADUs qualify for a development impact fee exemption, and that building permit fees and other fees may still be charged. Public Works describes development impact fees on added enclosed space, and that page prints no ADU exemption. State law bars an impact fee on an ADU of 750 square feet of interior livable space or less, and on a junior ADU of 500 square feet or less. School districts and Monterey One Water are separate from the city schedule. Ask the city which local fees apply to your permit.

Can I use an older pre-approved plan set?

For a new building permit application, no. The ADU page says that effective October 1, 2026, only the 2025 pre-approved plan sets are accepted. The page does not describe a leftover use for an older set.

Do I need a deed restriction?

The ADU page says applicable deed restriction documentation may be required before the permit is issued. For a pre-approved plan, the 2023 guidebook says Current Planning writes a restriction for the owner to sign, covering stays under 30 days, no separate sale, and the approved site plan. The page does not print how the document is notarized or how many weeks recording takes. A junior ADU has its own recorded restriction under state law. Ask Current Planning which form your project uses.

Is there an ADU hotline?

Yes. The ADU page lists 831-758-7208 and aduinquiry@salinas.gov. Planning's line on the pre-approved checklist is 831-758-7206. Appointments use the QLess link on that checklist. The Permit Center counter is 831-758-7251.

Can the pre-approved plans be used for a garage conversion?

No. The ADU page says the plans cannot be used for an attached ADU or for a conversion of existing space. A conversion needs its own plans. Permit Services posts a separate ADU conversion checklist.

Get the Salinas ADU permit checklist

The checklist is a California homeowner list you can download. It is not a Salinas city form. Use it next to the city's new ADU checklist and the pre-approved package checklist.

Get the ADU permit checklist

The longer statewide companion is the ADU eBook.

Last reviewed and sources

Last reviewed: November 24, 2026.

Each official URL below was checked November 24, 2026:

Other city permit pages are on the California city guides hub. Salinas does not share a counter with those cities. How to check a builder yourself is in how to find an ADU contractor.

Want to talk to builders who serve Salinas?

Request a match. This form is not a city permit, and it is not a promise that a builder is available this week.